General Contractor Scope of Work Template

A general scope has to do one extra job: say what it is not. When multiple trades are in play, the boundaries between them — and the work nobody has claimed — are where the money leaks.

Where general contracting scopes usually fail

The template

Copy this structure section by section. Anything you cannot state definitively belongs under exclusions or open items — not left out and hoped over.

Project Management

Work to be Performed

Materials & Specifications

Exclusions

Scope by Area — one heading per room or trade

Work to be Performed

Materials & Specifications

Exclusions

Allowances and Open Items

Work to be Performed

Materials & Specifications

Exclusions

Assumptions & Open Items

Every scope needs this section. List anything the homeowner raised that you did not confirm, and anything you inferred rather than agreed. It is the difference between a change order and an argument.

WalkProof writes this for you. Record the walkthrough, and you get a draft in exactly this structure — per area, with assumptions and unclear items flagged separately so you can check them before anything goes to the homeowner.