WalkProof

Flooring Scope of Work Template

Every flooring job has the same buried risk: the subfloor. A scope that says 'install new flooring' without addressing subfloor condition, levelling and transitions has already lost the argument that follows.

Where flooring scopes usually fail

The template

Copy this structure section by section. Anything you cannot state definitively belongs under exclusions or open items — not left out and hoped over.

Removal and Subfloor Preparation

Work to be Performed

Materials & Specifications

Exclusions

Installation

Work to be Performed

Materials & Specifications

Exclusions

Trim and Transitions

Work to be Performed

Materials & Specifications

Exclusions

Assumptions & Open Items

Every scope needs this section. List anything the homeowner raised that you did not confirm, and anything you inferred rather than agreed. It is the difference between a change order and an argument.

WalkProof writes this for you. Record the walkthrough, and you get a draft in exactly this structure — per area, with assumptions and unclear items flagged separately so you can check them before anything goes to the homeowner.

Other trades