Flooring Scope of Work Template
Every flooring job has the same buried risk: the subfloor. A scope that says 'install new flooring' without addressing subfloor condition, levelling and transitions has already lost the argument that follows.
Where flooring scopes usually fail
- Subfloor repair not excluded unless explicitly agreed.
- Levelling compound treated as included when the slab is out of tolerance.
- Transitions, thresholds and baseboard removal left unnamed.
The template
Copy this structure section by section. Anything you cannot state definitively belongs under exclusions or open items — not left out and hoped over.
Removal and Subfloor Preparation
Work to be Performed
- Remove existing floor covering and dispose
- Inspect and document subfloor condition and flatness before installing
Materials & Specifications
- Levelling compound if required, at the agreed unit rate
Exclusions
- Subfloor repair or replacement unless explicitly agreed after inspection
- Moisture mitigation on slab
Installation
Work to be Performed
- Acclimate material on site for the manufacturer's stated period
- Install flooring per manufacturer specification including expansion gaps
Materials & Specifications
- Product, thickness, wear layer and installation method
Exclusions
- Furniture moving unless listed
- Appliance disconnection
Trim and Transitions
Work to be Performed
- Install transitions at doorways and reinstall or replace base shoe
Materials & Specifications
- Transition profile and finish
Exclusions
- Door undercutting or trimming unless listed
Assumptions & Open Items
Every scope needs this section. List anything the homeowner raised that you did not confirm, and anything you inferred rather than agreed. It is the difference between a change order and an argument.